{"id":9169,"date":"2026-11-18T07:27:30","date_gmt":"2026-11-18T07:27:30","guid":{"rendered":"https:\/\/skatkeskus.ee\/?p=9169"},"modified":"2026-11-18T07:32:01","modified_gmt":"2026-11-18T07:32:01","slug":"modular-data-centre-expansion","status":"publish","type":"post","link":"https:\/\/skatkeskus.ee\/et\/modular-data-centre-expansion\/","title":{"rendered":"Modular Data Centre Expansion: What to Plan in Phase 1"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Modular Data Centre Expansion: What to Plan in Phase 1<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1408\" height=\"768\" src=\"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg\" alt=\"Server cabinets and cooling pipework for modular data centre expansion\" class=\"wp-image-9170\" srcset=\"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg 1408w, https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework-768x419.jpg 768w, https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework-18x10.jpg 18w, https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework-24x13.jpg 24w, https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework-36x20.jpg 36w, https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework-48x26.jpg 48w\" sizes=\"(max-width: 1408px) 100vw, 1408px\" ><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Modular data centre expansion starts with a decision about what to build now and what to prepare for later.<\/strong> Size the first modules for the IT load you expect at launch. At the same time, agree where the next modules will connect to power, cooling, fibre and controls. Leave room to deliver and install them while the first phase is in operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At SKAT-KESKUS, that planning draws on our experience prefabricating pipework for data centres. The same question applies at both scales: which work can we do in the workshop, and which connections will still have to be made on site?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What a Finnish data centre project taught us<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">On a data centre project in Finland, we fabricated pipe assemblies in our workshop while construction continued on site. Once an installation area was ready, the crew could fit prepared sections. As a result, less cutting, assembly and welding had to take place on the construction site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our team estimated that prefabrication reduced on-site installation work on that project by <strong>30\u201335%, equivalent to 12,000\u201314,000 working hours on site<\/strong>. We reported the case in <a href=\"https:\/\/www.aripaev.ee\/sisuturundus\/2026\/08\/24\/ehitusplatsilt-tootmisse-kuidas-torustike-eelvalmistamine-kiirendab-andmekeskuste-ehitust\">\u00c4rip\u00e4ev<\/a>. The figure describes one project\u2019s on-site workload; it does not measure total project labour or predict savings on other projects.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Phase 1 must cover for modular data centre expansion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Start with the expected IT load, rack density and availability requirements. Then sketch a plausible next phase. That comparison helps separate equipment needed at launch from space, connection points and utility capacity you should plan for early.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Power:<\/strong> Install distribution and backup capacity for the initial load and required redundancy. For expansion, check the utility connection and define where future switchgear, UPS equipment or generators could tie in.<\/li>\n\n\n\n<li><strong>Cooling:<\/strong> Select the cooling approach against actual rack density and expected workloads. If the design uses chilled water, plan where future circuits can connect and how the team will isolate them during installation.<\/li>\n\n\n\n<li><strong>Fibre and controls:<\/strong> Reserve routes for the next modules. Define how new racks, sensors and alarms will connect to the network and facility monitoring.<\/li>\n\n\n\n<li><strong>Site access:<\/strong> Set aside space for future modules and verify truck access, crane positions and service clearances. Check whether the installation can proceed while the first phase stays live.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For example, a second server module may fit neatly beside the first on a site plan. However, if the only route to the cooling connection crosses a live service area, adding that module could still require a shutdown. Review the installation sequence as part of <a href=\"https:\/\/skatkeskus.ee\/et\/data-centre-mep-engineering-early-coordination\/\">early MEP coordination<\/a>, before fixing the layout.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">From prefabricated pipework to modular data centre expansion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/skatmodular.com\/\">SKAT modulaarne alalisvool<\/a> combines containerised server space with separate power and cooling modules. We configure the modules around the first phase and define how they connect to one another and to the site. For example, a server module can bring power, cooling and fibre connections together at a dedicated interface.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That lets us assemble and test more of the system in a controlled workshop environment. Meanwhile, the site team can prepare the foundations and utility connections. Once the modules arrive, the project still needs on-site connections, integrated testing and commissioning before handover.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Standard connection points make later additions easier to plan. However, they cannot create spare grid capacity or accommodate a different cooling requirement on their own. If the next phase moves to denser AI or high-performance computing racks, check the cooling loads and electrical capacity again before ordering equipment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Questions to answer before the next phase<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Can you expand a modular data centre while it\u2019s live?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">It depends on how the systems can be isolated and tested. Identify which connections can be made independently, which require a planned outage and how to maintain the required redundancy during the work. Agree that sequence with the operator before finalising the design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Do we need to buy all the equipment up front?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Generally, the first phase only needs equipment sized for its load and its availability requirements. However, some provisions are much harder to add later, such as utility capacity, cable routes or space for new equipment. Compare the cost of making those provisions early with the cost and disruption of adding them on a live site.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Which parts should we prefabricate?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start with assemblies that repeat and have clear boundaries, such as pipe sections or configurable system modules. Then compare transport and lifting requirements with the work the team would otherwise need to do on site. Our <a href=\"https:\/\/skatkeskus.ee\/et\/modular-data-center-scalable-infrastructure\/\">overview of modular data centres<\/a> explains how server, power and cooling modules can be combined.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Plan your first phase and the next one together<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">SKAT-KESKUS is an Estonian engineering company working across data centre design, fabrication, installation and commissioning. If you\u2019re planning a modular deployment or adding capacity to an existing site, <a href=\"https:\/\/skatkeskus.ee\/et\/contact\/\">talk to our engineering team<\/a>. Bring your target IT load, rack density, site constraints and expected expansion timeline. Together, we can identify what belongs in Phase 1 and what needs to be ready for Phase 2.<\/p>","protected":false},"excerpt":{"rendered":"<p>What should you install today, and what should you leave ready for the next phase? A practical guide to power, cooling and site connections for modular data centres.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9169","post","type-post","status-publish","format-standard","hentry","category-mep"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modular Data Centre Expansion | Phase 1 Planning<\/title>\n<meta name=\"description\" content=\"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skatkeskus.ee\/et\/modular-data-centre-expansion\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modular Data Centre Expansion | Phase 1 Planning\" \/>\n<meta property=\"og:description\" content=\"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skatkeskus.ee\/et\/modular-data-centre-expansion\/\" \/>\n<meta property=\"og:site_name\" content=\"SKAT-KESKUS\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T07:27:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T07:32:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjutanud\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Eeldatav lugemisaeg\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#\\\/schema\\\/person\\\/661198263af1f20d817a4b07c5593dcd\"},\"headline\":\"Modular Data Centre Expansion: What to Plan in Phase 1\",\"datePublished\":\"2026-11-18T07:27:30+00:00\",\"dateModified\":\"2026-11-18T07:32:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/\"},\"wordCount\":838,\"publisher\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/modular-data-centre-expansion-pipework.jpg\",\"articleSection\":[\"MEP\"],\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/\",\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/\",\"name\":\"Modular Data Centre Expansion | Phase 1 Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/modular-data-centre-expansion-pipework.jpg\",\"datePublished\":\"2026-11-18T07:27:30+00:00\",\"dateModified\":\"2026-11-18T07:32:01+00:00\",\"description\":\"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/modular-data-centre-expansion-pipework.jpg\",\"contentUrl\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/modular-data-centre-expansion-pipework.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/modular-data-centre-expansion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skatkeskus.ee\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modular Data Centre Expansion: What to Plan in Phase 1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#website\",\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/\",\"name\":\"SKAT-KESKUS\",\"description\":\"MEP Engineering &amp; Services for Industrial and Commercial Infrastructure\",\"publisher\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skatkeskus.ee\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#organization\",\"name\":\"SKAT\",\"alternateName\":\"SKAT-KESKUS\",\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-1-2026-01_55_15-PM-840x560.png\",\"contentUrl\":\"https:\\\/\\\/skatkeskus.ee\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-1-2026-01_55_15-PM-840x560.png\",\"width\":840,\"height\":560,\"caption\":\"SKAT\"},\"image\":{\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skatkeskus.ee\\\/#\\\/schema\\\/person\\\/661198263af1f20d817a4b07c5593dcd\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/skatkeskus.ee\"],\"url\":\"https:\\\/\\\/skatkeskus.ee\\\/et\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modular Data Centre Expansion | Phase 1 Planning","description":"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skatkeskus.ee\/et\/modular-data-centre-expansion\/","og_locale":"et_EE","og_type":"article","og_title":"Modular Data Centre Expansion | Phase 1 Planning","og_description":"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.","og_url":"https:\/\/skatkeskus.ee\/et\/modular-data-centre-expansion\/","og_site_name":"SKAT-KESKUS","article_published_time":"2026-11-18T07:27:30+00:00","article_modified_time":"2026-11-18T07:32:01+00:00","og_image":[{"url":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg","type":"","width":"","height":""}],"author":"admin","twitter_card":"summary_large_image","twitter_image":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg","twitter_misc":{"Kirjutanud":"admin","Eeldatav lugemisaeg":"4 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#article","isPartOf":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/"},"author":{"name":"admin","@id":"https:\/\/skatkeskus.ee\/#\/schema\/person\/661198263af1f20d817a4b07c5593dcd"},"headline":"Modular Data Centre Expansion: What to Plan in Phase 1","datePublished":"2026-11-18T07:27:30+00:00","dateModified":"2026-11-18T07:32:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/"},"wordCount":838,"publisher":{"@id":"https:\/\/skatkeskus.ee\/#organization"},"image":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg","articleSection":["MEP"],"inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/","url":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/","name":"Modular Data Centre Expansion | Phase 1 Planning","isPartOf":{"@id":"https:\/\/skatkeskus.ee\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#primaryimage"},"image":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg","datePublished":"2026-11-18T07:27:30+00:00","dateModified":"2026-11-18T07:32:01+00:00","description":"Plan modular data centre expansion from Phase 1. See how SKAT-KESKUS prepares power, cooling and site connections for the next deployment.","breadcrumb":{"@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#primaryimage","url":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg","contentUrl":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/11\/modular-data-centre-expansion-pipework.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/skatkeskus.ee\/modular-data-centre-expansion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skatkeskus.ee\/"},{"@type":"ListItem","position":2,"name":"Modular Data Centre Expansion: What to Plan in Phase 1"}]},{"@type":"WebSite","@id":"https:\/\/skatkeskus.ee\/#website","url":"https:\/\/skatkeskus.ee\/","name":"SKAT-KESKUS","description":"MEP Engineering &amp; Services for Industrial and Commercial Infrastructure","publisher":{"@id":"https:\/\/skatkeskus.ee\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skatkeskus.ee\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/skatkeskus.ee\/#organization","name":"SKAT","alternateName":"SKAT-KESKUS","url":"https:\/\/skatkeskus.ee\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/skatkeskus.ee\/#\/schema\/logo\/image\/","url":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-1-2026-01_55_15-PM-840x560.png","contentUrl":"https:\/\/skatkeskus.ee\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-1-2026-01_55_15-PM-840x560.png","width":840,"height":560,"caption":"SKAT"},"image":{"@id":"https:\/\/skatkeskus.ee\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/skatkeskus.ee\/#\/schema\/person\/661198263af1f20d817a4b07c5593dcd","name":"admin","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/secure.gravatar.com\/avatar\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1114ca0e16fda4b434baa921b9f70cf18d1f3bd249c6e87bc89121242b627a2a?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/skatkeskus.ee"],"url":"https:\/\/skatkeskus.ee\/et\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/posts\/9169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/comments?post=9169"}],"version-history":[{"count":3,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/posts\/9169\/revisions"}],"predecessor-version":[{"id":9173,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/posts\/9169\/revisions\/9173"}],"wp:attachment":[{"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/media?parent=9169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/categories?post=9169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skatkeskus.ee\/et\/wp-json\/wp\/v2\/tags?post=9169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}